Proceedings:
No. 13: AAAI-21 Technical Tracks 13
Volume
Issue:
Proceedings of the AAAI Conference on Artificial Intelligence, 35
Track:
AAAI Technical Track on Planning, Routing, and Scheduling
Downloads:
Abstract:
We introduce a natural but seemingly yet unstudied generalization of the problem of scheduling jobs on a single machine so as to minimize the number of tardy jobs. Our generalization lies in simultaneously considering several instances of the problem at once. In particular, we have n clients over a period of m days, where each client has a single job with its own processing time and deadline per day. Our goal is to provide a schedule for each of the m days, so that each client is guaranteed to have their job meet its deadline in at least k
DOI:
10.1609/aaai.v35i13.17404
AAAI
Proceedings of the AAAI Conference on Artificial Intelligence, 35