Proceedings:
Vol. 20 (2010): Twentieth International Conference on Automated Planning and Scheduling
Volume
Issue:
Vol. 20 (2010): Twentieth International Conference on Automated Planning and Scheduling
Track:
Full Technical Papers
Downloads:
Abstract:
We describe a timeline-based scheduling algorithm developed for mission operations of the EO-1 earth observing satellite. We first describe the range of operational constraints for operations focusing on maneuver and thermal constraints that cannot be modeled in typical planner/schedulers. We then describe a greedy heuristic scheduling algorithm and compare its performance to both the prior scheduling algorithm - documenting an over 50% increase in scenes scheduled with estimated value of millions of dollars US. We also compare to a relaxed optimal scheduler showing that the greedy scheduler produces schedules with scene count within 15% of an upper bound on optimal schedules.
DOI:
10.1609/icaps.v20i1.13410
ICAPS
Vol. 20 (2010): Twentieth International Conference on Automated Planning and Scheduling